Description

Designed forsurface treatment of metal parts, producing a thin, uniform phosphateconversion coating that improves corrosion resistance, paint adhesion, and wearresistance. It is widely used in automotive, hardware, electronics, andindustrial metal finishing applications.

 

Machine Construction:

1. Frame: Made ofQ235 100x100x4.0t square tube, surface is coated with an anti-corrosion primerand an outer powder coating for enhanced durability and protection.

2. Tanks:Stainless steel material (3-5mm thick) with tube reinforcement for extradurability.

3. TransportSystem: 2set PLC-controlled transporters for precise and automatic movement.

4. Air AgitationSystem: Provides uniform solution circulation and stable operation.

5. Spray RinsingSystem: Automatically activated by the work piece lifting motion via asolenoid valve. This ensures targeted rinsing for superior cleaning while minimizing water consumption.

No items found.

Specifications

Phosphatingmachine process includes Loading → Degreasing → Water rinse1/2 → Activation → Water rinse1/2 → Phosphating → Water rinse1/2 → Passivation → Water rinse1/2 → Drying → Unloading

Dimension L22,500xW7,190xH8000MM

Tanks dimension L3500xW800xH1500 mm

Chrome heating/cooling Steam heating

Copper process time 15-60minuts

Total power consumption 220KW

Guarantee 1year

Optional Filter, Rectifier, Auto regeneration system; Coolingchiller; waste gas scrubber(acid fume treatment)

Size chart
How long is machine guarantee time?

All non-consumableparts are covered by a one-year warranty. Any defect under normal operationwill be replaced free of charge, excluding damage caused by misuse or naturaldisasters.

Why choose us?

1). With more than25 years of experience serving multiple industries, we can design equipmentthat best meets your needs.
2). Allmanufacturing processes are carried out in our own factory, ensuring bettercost control and more competitive equipment prices.
3). We aim forlong-term cooperation and focus on providing reliable, high-quality machines toensure excellent performance in your actual production.

Do youprovide installation service?

Definitely. Wehave a professional overseas installation team, typically consisting of onetranslator, two mechanical engineers, and one electrical engineer. Toaccelerate the overall installation and commissioning process, local laborsupport from your side is required.

Where are you located? How to visit us?

Warmly welcome tovisit us
Our address: No.123, Hanjiang West Road, Xuejia Town, Changzhou, Jiangsu, China.
If you arearriving from Shanghai, please take the high-speed train from Shanghai HongqiaoStation to Changzhou North Station — the journey takes about one hour. We willarrange to pick you up upon arrival.If you are comingfrom another city in China (such as Shenzhen or Guangzhou), you may take adirect flight to Changzhou Benniu International Airport.
Before your visit,please kindly contact me in advance so I can suggest the most convenient traveloption.
For any inquiries,feel free to reach me directly via WeChat/WhatsApp or email (as shown in thevideo).